Operations and Information Systems: Midterm Assessment

A comparison of project-based & product-based process design

Student No. @00382153
Submission Date : 15th December 2013
Word count : 2,496

MSc PROJECT MANAGEMENT

Operations and Information Systems: Midterm Assessment

Student No.
@00382153

A comparison of project-based & product-based process design  

1.  Abstract ......................................................................................................................... 3  2.  Introduction .................................................................................................................. 3  3.  Business environment .................................................................................................. 3  4.  Performance objectives ................................................................................................ 4  5.  Process design ............................................................................................................... 8  6.  Project management .................................................................................................. 13  7.  Summary & conclusion .............................................................................................. 16  References........................................................................................................................... 17 

Submission Date : 15 December 2013
 

Page 2 of 17

Student No.
@00382153

MSc PROJECT MANAGEMENT

Operations and Information Systems: Midterm Assessment
A comparison of project-based & product-based process design  

A) By taking as an example an organization or a product from an industry that you are familiar with, critically discuss the main factors that influence the choice of a manufacturing/service process design.

(70% of the mark)

B) How do you see the main principles of project management aiding the operations manager/manageress in introducing change to the process/system? (30% of the mark)

1.

Abstract

The assignment will examine the differing and sometimes conflicting characteristics of process design criteria and project management between a project-based and productbased design process within the same organization. 2.

Introduction

Today many of us are familiar with Google Earth and viewing images of the earth over the Internet, indeed similar products are offered by Microsoft and Apple together with others, including government and commercial organisations around the world.

The technical

term for the image is an “Orthophoto Map”, as every point on the image is viewed in its correct geographical location with no distortion caused by ground terrain or camera lens. The production of orthophoto maps has undergone a number of transformations over the past 15 years with different design processes being applied to different products and enduser requirements.

These changes have particularly affected the design process and the

way in which the product is manufactured, ranging from small project-orientated processes to mass production.
3.

Business environment

The UK market is characterized by a number of SME organizations, high competition and projects awarded on a lowest price basis, which combined with the client’s lack of technical knowledge makes quality variable.

Each contract is produced individually to

client specifications as low-volume, high-variety projects, based upon vertical photography Submission Date : 15 December 2013
 

Page 3 of 17

MSc PROJECT MANAGEMENT

Operations and Information Systems: Midterm Assessment

Student No.
@00382153

A comparison of project-based & product-based process design  

taken from aircraft, leading to different design processes depending upon specific requirements.

Therefore the relationship between operations and competitiveness is

critical to the success of the business.
In order to remain competitive Aerofilms Limited considered it had two solutions to consider.

The first was to reduce costs by using lower-cost labour abroad, but this was

rejected due to lack of quality control, it was also considered that competitors could take the same approach and so further reduce sales prices.

The second option was to turn

orthophoto map production into a high-volume, low-variety product available on-demand to the customer. The advantage of the second approach was to reduce overall costs and from a customer perspective, standardize the technology and have immediate delivery rather than go through a procurement and subsequent project period waiting for delivery at a future date. The aim was to turn a contrac...

Read more

Keywords

0 00382153 1 10 11 12 13 131215 14 15 15th 16 17 1991 1999 2 2004 2010 2011 2013 3 30 4 496 5 6 7 70 8 9 abil abl abroad abstract accept achiev acquir activ addit adjac advantag aerial aerofilm aesthet affect aid aim aircraft al align alloc allow almost also although analysi apart appear appl appli applic approach appropri area around aspect assess assign associ attract author autom automat autumn avail award b base basi basic be-spok becam benefit best block bound boundari breed bring broad broken brought busi camera capabl capac capit case caus celebr cell certain chamber chang character characteris characterist chemic choic clear client co co-depend combin commenc commerci commit compani comparison competit competitor complet complimentari conclud conclus conflict confus consid consist context continu contract contrast control convent cope core correct cost could count counti countri cours creat criteria critic crop croxal cultur current custom cycl data dataset date decemb decid decis dedic defect defin definit delay deliveri demand demonstr depart depend design detail determin develop differ digit discuss disrupt distort divid document dramat due earth easili ed edit educ effect effici effort eg element elimin emphasi encompass enddat endus ensur environ error error-fre especi essenti et event everi examin exampl excess expand experi experienc extern factor failur fall familiar fast fee fenc field figur film final find first fit five flexibl fli flowlin focus follow format four fourth free frosti fuel full fulli function fundament futur geograph give go good googl govern great grid ground half half-way hall happen help hide high high-flex high-perform high-varieti high-volum higher higher-qu hill howev human hybrid identifi ie imag immedi impact implement import impress improv in-process inappropri includ inconsist increas inde indic individu industri influenc inform initi innov input interest internet interrel introduc introduct inventori invest involv irregular irrespect issu johnston keep key know knowledg kpi labour lack larg layout lead learn len less lesson let level licenc limit line link locat long long-term lot low low-flex low-varieti low-volum lower lower-cost lowest m made made-to-stock main mainten major make manag manager/manageress mani manner manual manufactur manufacturing/service map mark market mass mass-produc materi may mayb meet microsoft midterm might minim minimum mix model modul month move msc much multipl n nation neat need new next number object of-bre off-the-shelf offer omit on-demand on-specif on-tim one one-off ongo oper opportun optim option order organ organis orient orthophoto other otherwis outlin output overal overlap page part parti particular pass past pearson peopl perform period person perspect philosophi photographi place plan play point portfolio possibl potenti predomin prentic price primari principl prior priorit prioriti procedur process process/system procur produc product product-bas productbas production/operations profhack program project project-bas project-orient proper provid put qualifi qualiti r radar rang rate rather re re-cycl record reduc refer reject relat relationship reliabl remain remov requir reschedul resolv resourc respons restrict result revenu review reward ring ring-fenc risk role rule s.l sale salford save schedul second see select sequenc servic set seven sever shape shelf short show signific similar singl single-point six sixth skill slack slight small sme softer softwar solut sometim specif speed spoke squar staff stage stakehold standard standardis start state step stock strateg strategi streamlin student submiss subsequ success suggest summari suppli supplier support sure surround system tabl take taken target task team technic technolog temporari temptat term terrain test tetrad text therefor third third-parti three throughput time timesav today togeth tool toward trade trade-off tradit train transform treat tri turn twelv two type typic uk undergon understood undertak unexpect univers unreli unspecifi updat upon us use usual utilis variabl varieti vertic view volum volume/variety wait wast way weather well well-defin well-train whatev wherebi whether whilst whole wide wideman within word work workflow world would year